Skip to main content

Land and buildings
for data centers

We source sites in Morocco for operators and investors, screened for power access, network routes, clean title and a permitting path that holds.

Site criteria

What we check
before you travel

A site either carries a data center or it does not. We screen against the constraints that decide it, and we tell you early when a plot fails one.

  • Power access

    Distance to the nearest suitable line and substation, the route a new connection would take, and what the utility will put in writing about it.

  • Network routes

    How close existing fibre runs, how many physically separate routes reach the boundary, and who owns the ducts along the way.

  • Title and buildable area

    Registered title, the area you can actually build on, plot shape and the setbacks that decide how much of it a hall can occupy.

  • Water and cooling

    Water availability for the cooling design under discussion, and the climate constraints that push a project toward air cooling.

  • Ground and access

    Soil and drainage studies where they exist, flood exposure, and whether transformers and generators can reach the plot by road.

  • Zoning and neighbours

    The zoning classification, what the plan allows on the parcel, and what sits next door today and is permitted to arrive tomorrow.

Where a number matters, we get it from the utility, the land registry or the commune in writing. We do not quote capacity we cannot show you.

What we source

Three shapes
of site

Most briefs land on one of three shapes. We run all three in parallel until one clears the checks.

Land

Serviced plots

Land inside an equipped zone, where roads, power and fibre already reach the boundary and the permitting path is the shortest available.

See land listings
Land

Parcels to assemble

Larger holdings outside the equipped zones, often several titles that have to be bought together before anything can be drawn on them.

See land listings
Buildings

Existing buildings

Sheds and office floors that can take a small hall or an edge deployment sooner than new build, with a shorter path to a power connection.

See building listings
Method

From brief
to signed deed

Five steps, each one closed with a written note, so no decision rests on a phone call.

  1. Write the brief

    We turn the load, the timeline and the budget into a site specification: area, power target, network requirement, and what you will not compromise on.

  2. Screen the market

    We search listed and off-market stock, discard the plots that fail a hard constraint, and come back with a short list rather than a catalogue.

  3. Test power and network

    We put the questions to the utility and the network operators in writing, and we walk the site with you to see the access and the neighbours.

  4. Clear the title

    Our notary confirms registration, boundaries, charges and rights of way, and we set out what an assembly of several parcels would take.

  5. Negotiate and close

    We negotiate price and conditions, structure the promise to sell around the permits still outstanding, and stay on the file until the deed is signed.

Introductions

Operators, investors
and landowners

Site sourcing rarely stops at the plot. We work with the parties on either side of it and make the introduction when it moves a project forward.

For investors, that means owners who will sell and operators who need capacity. For operators, it means landowners who understand a long due diligence and will hold a plot while it runs. We introduce, we do not sit inside the terms you agree between you.

Operators

Colocation and hosting groups looking for their next site, or for space they can take on quickly.

Investors

Buyers of land and buildings who want an infrastructure tenant rather than a residential one.

Landowners

Owners of industrial and peri-urban parcels open to a sale or a long lease.

FAQ

Questions
buyers ask first

Short answers to what comes up on every data center brief. Anything specific to your load, we answer on the call.

Talk to our team

Next step

Send us the load and the date

Tell us the power target, the footprint and when you need to be live. We come back with the sites worth a visit and what each one still has to prove.